Gypsum Powder Plant with Capacity of 20,000-300,000T/Year
Capasity tonn/year |
Tonn/hour |
Heating system |
Boiling furnace size |
20,000 |
2.7 |
Oil or steam |
4.5M×1.0M×1.2M |
30,000 |
4.2 |
4.5M×1.2M×1.4M |
|
50,000 |
6.9 |
4.5M×1.4M×1.6M |
|
60,000 |
8.3 |
4.5M×1.6M×1.8M |
|
80,000 |
11.11 |
4.5M×1.8M×2.0M |
|
100,000 |
13.88 |
4.5 M×2.0 M×2.2 M |
|
150,000 |
20.83 |
4.5 M×2.2 M×2.4 M |
|
200,000 |
27.77 |
4.5 M×2.4 M×2.6 M |
|
300,000 |
41.66 |
4.5 M×2.6 M×2.8 M |